San Vicente, CA
Start Date: 06/16/2021, Completion Date: 09/20/2021
Contracting Agency: Federal Highway Administration, CFL
This project consisted of installing a water filled cofferdam using water-filled bladder to divert water away from the active work site.
Pavkov installed erosion control measures, as well as provided a Storm Water, and Environmental Protection Plan in compliance with the terms of the contract. Some of these environmental measures included the protection of the endangered red-legged frog as well as the reintroduction of the steelhead salmon into the San Vicente waterway. Ms. Hillary Pavkov performed active frog and salmon monitoring as well as turbidity monitoring.
In addition to the environmental measures Pavkov consistently kept under observation our team formed and poured concrete for the bridge replacement as well as installed stone rip rap.